Change Currency: GBP USD EUR

Change Language: 
      Deutsch
    
      English (UK)
    English (US) 
      Español
    
      Française
    
      Dutch

 

Rubber Floor Fitting

 

      1) Lay rolls out leaving a 20 mm gap from width to width to allow the rubber to breathe / stretch and retract for 24 hrs

 

 

 

2) Mark out a straight line on the subfloor with chalk line or similar, to ensure that the rolls are installed straight

 

 

 

3) Place rolls together overlapping widths by minimum of 10 mm

 

 

 

4) Pull back half on each roll to expose clean sub floor

 

 

 

5) Apply adhesive to sub floor using recommended adhesive and trowel (can be supplied by www.meadeeflooring.co.uk)

 

 

 

6) Place roll drops back on to wet adhesive

 

 

 

7) Push out trapped air with a 100 kg roller, rolling both ways (if no roller, put pressure on a broom)

 

 

 

8) Repeat steps 4-7 with remaining half

 

 

 

9) Get a straight edge and sharp knife. Place straight edge on top of overlap.

 

 

 

10) Cut a straight neat line so the roll widths now butt together

 

 

 

11) Roll joints, cut in edges

 

 

 

12) Leave adhesive to dry as per manufacturers recommendation (overnight)

 

 

 

13) Now equipment can be placed on top

 

 

 

Share

"Cannons UK" would like to place cookies on your computer to help us make this website better. To find out more about the cookies, see our privacy policy.

I accept cookies from this site.

eCommerce Software by CubeCart