1) Lay rolls out leaving a 20 mm gap from width to width to allow the rubber to breathe / stretch and retract for 24 hrs
2) Mark out a straight line on the subfloor with chalk line or similar, to ensure that the rolls are installed straight
3) Place rolls together overlapping widths by minimum of 10 mm
4) Pull back half on each roll to expose clean sub floor
5) Apply adhesive to sub floor using recommended adhesive and trowel (can be supplied by www.meadeeflooring.co.uk)
6) Place roll drops back on to wet adhesive
7) Push out trapped air with a 100 kg roller, rolling both ways (if no roller, put pressure on a broom)
8) Repeat steps 4-7 with remaining half
9) Get a straight edge and sharp knife. Place straight edge on top of overlap.
10) Cut a straight neat line so the roll widths now butt together
11) Roll joints, cut in edges
12) Leave adhesive to dry as per manufacturers recommendation (overnight)
13) Now equipment can be placed on top
eCommerce Software by CubeCart